The Clipsal C-Bus system is a microprocessor based wiring system to control lighting and other electrical services. From on/off control of a lighting circuit to analogue type control, Such as dimming electronic fluorescent ballasts, C-Bus can control and automate virtually any type of electrical load
Legrand CLIPSAL SWITCH 1 GANG – 30Amps
Key Features:
1 gang
Rockers are a long throw momentary action type
C-bus learn enabled
LED button indicators provide illumination and status feedback
Night light feature
Fall back level option to dim indicators at a set time after the last button press
Mounted using standard mounting accessories
₦6,600.00
CompareBased on 0 reviews
Be the first to review “Legrand CLIPSAL SWITCH 1 GANG – 30Amps”
-
SOLAR POWERED
Solar Light & Fan
• Solar Panel: 20W solar panel with 6m cable;
• SMF lead Acid Battery: 12V 12Ah;
• Lamp:8PCS super bright 3W LED lamp with 5m cable;
• With USB port to charge mobile phones, MP3, MP4 etc;
• Switch: Output controller;
• Charging indicator: Yes;
• Charging time: About 10 hours (by solar panel); About 8~10 hours (by adapter);
• Lighting time: 6 pcs 3W LED 7~8 hours when the battery is fully charged;
• AC Adapter : Input AC100-240V,output DC16V?4A, by option;
• Match with 1*8W/12V DC Fan.SKU: 1527 -
DISTRIBUTION BOARDS, DISTRIBUTION BOARDS, Electro
Powertec 8 Way 100A Three Phase(TPN) Distribution Board C/W MCB
DISTRIBUTION BOARDS, DISTRIBUTION BOARDS, ElectroPowertec 8 Way 100A Three Phase(TPN) Distribution Board C/W MCB
Features
Compact DBs which occupy minimum space
Raised neutral link for easy wiring
Suitable for surface & fush mounting
Detachable din bar with end stoppers for easy assembly of breakers
Supplied with fully shielded bus-bars
Level marks for providing indication for fitment in wall
Supplied with neutral & earth link, top & bottom detachable plates
Supplied with masking sheet to protect components from cement during plastering.SKU: 283
There are no reviews yet.